The Timber Lake City Board discussed refurbishing the water tower at its June 9 regular meeting. A new water tower was part of the city’s original infrastructure grant but bids came in higher than expected so the water tower was removed from the plan.The board is now considering a proposal from Maguire Iron of Sioux Falls to refurbish the existing tank and tower at a cost of $417,000, ...